Measurement of construction productivity: brickwork and blockwork. Part B
The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis.
Saved in:
Main Authors: | Ananda K.W. Jayawardane, Andrew Price, Francis C. Harris |
---|---|
Format: | Default Article |
Published: |
1995
|
Subjects: | |
Online Access: | https://hdl.handle.net/2134/15053 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Measurement of construction productivity: brickwork and blockwork. Part A
by: Ananda K.W. Jayawardane, et al.
Published: (1995) -
A strategy for managing brickwork in Sri Lanka
by: Walimuni V.K.M. Abeysekera
Published: (1997) -
Regression analysis for building contractors: an assessment of its potential, an analysis comparing the estimation of brickwork costs by regression analysis and by conventional methods
by: Allan Ashworth
Published: (2021) -
A new approach for optimizing earth moving operations. Part I
by: Ananda K.W. Jayawardane, et al.
Published: (1995) -
Brickworks.
by: Heeney, Gwen
Published: (2000)