Measurement of construction productivity: brickwork and blockwork. Part B
The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis.
Saved in:
Main Authors: | , , |
---|---|
Format: | Default Article |
Published: |
1995
|
Subjects: | |
Online Access: | https://hdl.handle.net/2134/15053 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|