Measurement of construction productivity: brickwork and blockwork. Part B

The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis.

Saved in:
Bibliographic Details
Main Authors: Ananda K.W. Jayawardane, Andrew Price, Francis C. Harris
Format: Default Article
Published: 1995
Subjects:
UK
Online Access:https://hdl.handle.net/2134/15053
Tags: Add Tag
No Tags, Be the first to tag this record!