Measurement of construction productivity: brickwork and blockwork. Part B

The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis.

Saved in:
Bibliographic Details
Main Authors: Ananda K.W. Jayawardane, Andrew Price, Francis C. Harris
Format: Default Article
Published: 1995
Subjects:
UK
Online Access:https://hdl.handle.net/2134/15053
Tags: Add Tag
No Tags, Be the first to tag this record!
id rr-article-9458192
record_format Figshare
spelling rr-article-94581921995-01-01T00:00:00Z Measurement of construction productivity: brickwork and blockwork. Part B Ananda K.W. Jayawardane (7178510) Andrew Price (1257918) Francis C. Harris (7180490) Other built environment and design not elsewhere classified Brickwork and blockwork productivity Activity sampling Basic and standard times UK Built Environment and Design not elsewhere classified The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis. 1995-01-01T00:00:00Z Text Journal contribution 2134/15053 https://figshare.com/articles/journal_contribution/Measurement_of_construction_productivity_brickwork_and_blockwork_Part_B/9458192 CC BY-NC-ND 4.0
institution Loughborough University
collection Figshare
topic Other built environment and design not elsewhere classified
Brickwork and blockwork productivity
Activity sampling
Basic and standard times
UK
Built Environment and Design not elsewhere classified
spellingShingle Other built environment and design not elsewhere classified
Brickwork and blockwork productivity
Activity sampling
Basic and standard times
UK
Built Environment and Design not elsewhere classified
Ananda K.W. Jayawardane
Andrew Price
Francis C. Harris
Measurement of construction productivity: brickwork and blockwork. Part B
description The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis.
format Default
Article
author Ananda K.W. Jayawardane
Andrew Price
Francis C. Harris
author_facet Ananda K.W. Jayawardane
Andrew Price
Francis C. Harris
author_sort Ananda K.W. Jayawardane (7178510)
title Measurement of construction productivity: brickwork and blockwork. Part B
title_short Measurement of construction productivity: brickwork and blockwork. Part B
title_full Measurement of construction productivity: brickwork and blockwork. Part B
title_fullStr Measurement of construction productivity: brickwork and blockwork. Part B
title_full_unstemmed Measurement of construction productivity: brickwork and blockwork. Part B
title_sort measurement of construction productivity: brickwork and blockwork. part b
publishDate 1995
url https://hdl.handle.net/2134/15053
_version_ 1797468102485606400