Measurement of construction productivity: brickwork and blockwork. Part B
The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis.
Saved in:
Main Authors: | , , |
---|---|
Format: | Default Article |
Published: |
1995
|
Subjects: | |
Online Access: | https://hdl.handle.net/2134/15053 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
rr-article-9458192 |
---|---|
record_format |
Figshare |
spelling |
rr-article-94581921995-01-01T00:00:00Z Measurement of construction productivity: brickwork and blockwork. Part B Ananda K.W. Jayawardane (7178510) Andrew Price (1257918) Francis C. Harris (7180490) Other built environment and design not elsewhere classified Brickwork and blockwork productivity Activity sampling Basic and standard times UK Built Environment and Design not elsewhere classified The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis. 1995-01-01T00:00:00Z Text Journal contribution 2134/15053 https://figshare.com/articles/journal_contribution/Measurement_of_construction_productivity_brickwork_and_blockwork_Part_B/9458192 CC BY-NC-ND 4.0 |
institution |
Loughborough University |
collection |
Figshare |
topic |
Other built environment and design not elsewhere classified Brickwork and blockwork productivity Activity sampling Basic and standard times UK Built Environment and Design not elsewhere classified |
spellingShingle |
Other built environment and design not elsewhere classified Brickwork and blockwork productivity Activity sampling Basic and standard times UK Built Environment and Design not elsewhere classified Ananda K.W. Jayawardane Andrew Price Francis C. Harris Measurement of construction productivity: brickwork and blockwork. Part B |
description |
The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis. |
format |
Default Article |
author |
Ananda K.W. Jayawardane Andrew Price Francis C. Harris |
author_facet |
Ananda K.W. Jayawardane Andrew Price Francis C. Harris |
author_sort |
Ananda K.W. Jayawardane (7178510) |
title |
Measurement of construction productivity: brickwork and blockwork. Part B |
title_short |
Measurement of construction productivity: brickwork and blockwork. Part B |
title_full |
Measurement of construction productivity: brickwork and blockwork. Part B |
title_fullStr |
Measurement of construction productivity: brickwork and blockwork. Part B |
title_full_unstemmed |
Measurement of construction productivity: brickwork and blockwork. Part B |
title_sort |
measurement of construction productivity: brickwork and blockwork. part b |
publishDate |
1995 |
url |
https://hdl.handle.net/2134/15053 |
_version_ |
1797468102485606400 |