A cost estimate maturity benchmark method to support early concept design decision-making: a case study application to the small modular nuclear reactor

Constructing large Nuclear Power Plants (NPPs) is synonymous with significant cost and schedule uncertainty. Innovative Small Modular Reactors (SMRs) have been identified as a way of increasing certainty of delivery, whilst also maintaining a competitive Life Cycle Cost (LCC). Previous research into...

Full description

Saved in:
Bibliographic Details
Main Author: Amritpal Agar
Format: Default Thesis
Published: 2020
Subjects:
Online Access:https://dx.doi.org/10.26174/thesis.lboro.11809464.v1
Tags: Add Tag
No Tags, Be the first to tag this record!