Loading…

Optimizing development of Angola's Girassol field

Bouchet et al. describe key elements in a multi-technology application to update development of a deepwater field first initiated in 1998. The critical reservoir model needed to plan optimum development of this major field with an estimated 1.5 billion bbl oil-in-place was built and updated by 4D se...

Full description

Saved in:
Bibliographic Details
Published in:World Oil 2005-03, p.1
Main Author: R. Bouchet, B. Levallois, G. Mfonfu and J-F. Authier
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Bouchet et al. describe key elements in a multi-technology application to update development of a deepwater field first initiated in 1998. The critical reservoir model needed to plan optimum development of this major field with an estimated 1.5 billion bbl oil-in-place was built and updated by 4D seismic, downhole measurements, tracer injection, production logging and other technologies.
ISSN:0043-8790