Loading…
Systems Engineering and Program Management: Trends and Costs for Aircraft and Guided Weapons Programs
Systems engineering and program management (SE/PM) constitute a large portion of the acquisition cost of military aircraft and guided weapons systems. The goal of this study was the development of a set of cost-estimating relationships that can be used to estimate the SE/PM cost element for developm...
Saved in:
Published in: | Policy File 2006 |
---|---|
Main Authors: | , , |
Format: | Report |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Systems engineering and program management (SE/PM) constitute a large portion of the acquisition cost of military aircraft and guided weapons systems. The goal of this study was the development of a set of cost-estimating relationships that can be used to estimate the SE/PM cost element for development and production of aircraft and weapons programs. The authors canvassed government and industry personnel to learn about current techniques for estimating SE/PM costs, and they collected historical data from several aircraft and weapons programs to investigate trends in SE/PM costs over time and to generate methods that cost analysts can use early in the life cycle of a program when little cost information is available. The authors also investigated the effects on SE/PM costs from acquisition reform, including the reduction in the number of military specifications and standards, the use of integrated product and process teams, and the trend toward "evolutionary acquisition." |
---|