MIX AND MATCH

Because of the sloped site, we also had to pull out an existing retaining wall and its foundation." Getting the slope right Neither the new nor the old parking deck feature vehicle ramps for circulation. Since the structure is built into the side of a hill, vehicles can enter the grade level se...

Full description

Saved in:
Bibliographic Details
Published in:Concrete Products 2013-09, Vol.116 (9), p.36-37
Main Author: Diez, Roy
Format: Magazinearticle
Language:eng
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Because of the sloped site, we also had to pull out an existing retaining wall and its foundation." Getting the slope right Neither the new nor the old parking deck feature vehicle ramps for circulation. Since the structure is built into the side of a hill, vehicles can enter the grade level section from one ride, the middle level section from a different ride, and the top level from yet another entry.
ISSN:0010-5368