Loading…

Operations Scheduling for Rail Mounted Gantry Cranes in a Container Terminal Yard

Arranging the retrieving sequence and making the operational plans for gantry cranes to enhance port efficiency have become vital issues for the container terminals. In this paper, the problem of retrieving containers from a yard in a given sequence is discussed as an important part of the ship-load...

Full description

Saved in:
Bibliographic Details
Published in:Shanghai jiao tong da xue xue bao 2014-06, Vol.19 (3), p.337-345
Main Author: 边展 李娜 李向军 靳志宏
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Arranging the retrieving sequence and making the operational plans for gantry cranes to enhance port efficiency have become vital issues for the container terminals. In this paper, the problem of retrieving containers from a yard in a given sequence is discussed as an important part of the ship-loading process. This problem is divided into three categories according to its optimization complexity, i.e., the retrieval problem of a crane with a single spreader (ACSS), the retrieval problem of a crane with multiple spreaders (ACMS), and the retrieval problem of multiple cranes with a single spreader (MCSS). Firstly, heuristic algorithms are proposed to develop a retrieving sequence for ACSS to reduce the operational time. Then, optimizing the assignment to multiple spreaders is conducted by exchanging the movements of the obtained retrieving sequence. Finally, the movements are further assigned to two cranes and integrated with the MCSS retrieval problem mentioned above. The numerical experiments show the effectiveness and practicability of the heuristic algorithms.
ISSN:1007-1172
1995-8188
DOI:10.1007/s12204-014-1507-5