Loading…

High-Rate Mining Technology Simulation Modeling

Currently, the rate of heading in mines falls short of the capacities of the advanced power-driven machine systems. High-rate mining technology using a robotic travelling module has no parallel and essentially accelerates operation. Determination of operating modes of the module, their checking and...

Full description

Saved in:
Bibliographic Details
Published in:Journal of mining science 2022-06, Vol.58 (3), p.398-404
Main Authors: Klishin, V. I., Starodubov, A. N., Zinov’ev, V. V., Turgenev, A. D.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Currently, the rate of heading in mines falls short of the capacities of the advanced power-driven machine systems. High-rate mining technology using a robotic travelling module has no parallel and essentially accelerates operation. Determination of operating modes of the module, their checking and visualization is implemented by combining the simulation modeling and computer animation. The models based on specialized software GPSS Studio and Proof Animation enable interactive studies into joint operation of heading machinery and walking powered roof support. The tests provide the estimate of the heading cycle time.
ISSN:1062-7391
1573-8736
DOI:10.1134/S1062739122030061