Loading…
Engineering problems of dehydration and disposal of sewage sludge
The engineering problems of processing of sewage sludge in devices of a new type of flotation combine machine are considered. Experimental research of thickening process of activated sludge suspension after secondary tank in the flotation combine machine are conducted. Further dehydration with using...
Saved in:
Published in: | IOP conference series. Earth and environmental science 2021-09, Vol.864 (1), p.12040 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The engineering problems of processing of sewage sludge in devices of a new type of flotation combine machine are considered. Experimental research of thickening process of activated sludge suspension after secondary tank in the flotation combine machine are conducted. Further dehydration with using of the proposed scheme of drying with the closed circuit heat carrier system is possible. A unit of preparation of the heat carrier, a drying chamber, a device for unloading the finished product, a waste drying agent cleaning system, a waste heat carrier post-treatment unit, and a two-circuit system of pneumatic conveying in the scheme are included. An entry of toxic sludge substances into the environment in the offered scheme is excluded. |
---|---|
ISSN: | 1755-1307 1755-1315 |
DOI: | 10.1088/1755-1315/864/1/012040 |