Loading…

A neural network approach for early cost estimation of structural systems of buildings

The importance of decision making in cost estimation for building design processes points to a need for an estimation tool for both designers and project managers. This paper investigates the utility of neural network methodology to overcome cost estimation problems in early phases of building desig...

Full description

Saved in:
Bibliographic Details
Published in:International journal of project management 2004-10, Vol.22 (7), p.595-602
Main Authors: Gunaydin, H Murat, Dogan, S Zeynap
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The importance of decision making in cost estimation for building design processes points to a need for an estimation tool for both designers and project managers. This paper investigates the utility of neural network methodology to overcome cost estimation problems in early phases of building design processes. Cost and design data from thirty projects were used for training and testing our neural network methodology with eight design parameters utilized in estimating the square meter cost of reinforced concrete structural systems of 4–8 storey residential buildings in Turkey, an average cost estimation accuracy of 93% was achieved.
ISSN:0263-7863
1873-4634
DOI:10.1016/j.ijproman.2004.04.002