Loading…

An innovative approach for distribution network reinforcement planning: Using DER flexibility to minimize investment under uncertainty

•DER flexibility accurately modelled with intra and intertemporal constraints.•Network reinforcement method that uses flexibility over assets upgrade.•Risk minimization method to deal with the uncertainty of future scenarios. The increasing integration of Distributed Energy Resources (DER) in electr...

Full description

Saved in:
Bibliographic Details
Published in:Electric power systems research 2020-06, Vol.183 (C), p.106272, Article 106272
Main Authors: Tavares, Bruna, Soares, Filipe Joel
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:•DER flexibility accurately modelled with intra and intertemporal constraints.•Network reinforcement method that uses flexibility over assets upgrade.•Risk minimization method to deal with the uncertainty of future scenarios. The increasing integration of Distributed Energy Resources (DER) in electricity networks has required an improvement in the network management procedures. While the operation paradigm is evolving and adapting to the new network features, the planning approach is rather inefficient as network assets are usually oversized to meet the worst-case scenario. In this regard, this paper presents an innovative methodology that integrates the potential flexibility of DER into the planning process, in an attempt to bridge the gap between current network operation approaches and the planning methods. It includes an analysis of future scenarios, providing different reinforcement plans considering the realistic network operation for those scenarios. The proposed optimal design of the reinforcement plans has two complementary processes: First to optimize flexible resources in their owner's perspective and second to reschedule the flexible resources’ operation when the DSO needs to solve technical problems. The model has been tested in a typical Portuguese medium voltage network using future scenarios of DER integration from ENTSO-E. The results conclude that the proposed methodology leads to cost-effective solutions, which provide a better use of flexible resources, deferring high capital investments in network reinforcement.
ISSN:0378-7796
1873-2046
DOI:10.1016/j.epsr.2020.106272