Loading…
Status of the first stage of linear induction accelerator SILUND-21
In the present paper we report on status of the project of SILUND-21 LIA which is under development at JINR. SILUND-21 will provide electron beams with the energy up to 10 MeV, peak current /spl sim/1 kA and pulse duration 50-70 ns. SILUND-21 will serve as a base of experimental facility to study mi...
Saved in:
Main Authors: | , , , , , , , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In the present paper we report on status of the project of SILUND-21 LIA which is under development at JINR. SILUND-21 will provide electron beams with the energy up to 10 MeV, peak current /spl sim/1 kA and pulse duration 50-70 ns. SILUND-21 will serve as a base of experimental facility to study microwave electronics, FEL technique and two-beam acceleration. It is assumed also to perform experiments to adopt the FEL bunching technique for generation of the CLIC driving beam. |
---|---|
DOI: | 10.1109/PAC.1995.505197 |