Loading…

500 kV Mercury Accelerator

The objective of building a low-cost pre-accelerator for low energy heavy ion particle accelerator was realized by using standard, readily available material and hardware. Some savings were obtained in the construction of the dome by avoiding welding, expensive metal spinnings and unnecessary corona...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on nuclear science 1979-01, Vol.26 (3), p.3039-3041
Main Authors: Brodowski, J., Maschke, A. W., Mobley, R. N., Keane, J. T., Meier, E.
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The objective of building a low-cost pre-accelerator for low energy heavy ion particle accelerator was realized by using standard, readily available material and hardware. Some savings were obtained in the construction of the dome by avoiding welding, expensive metal spinnings and unnecessary corona rings. Larger monetary economies were realized by a unique approach to building the high voltage column utilizing a glass tube.
ISSN:0018-9499
1558-1578
DOI:10.1109/TNS.1979.4329932