Loading…

Tailwater recycling for hydro-power generation, Niger River

In this paper an alternative source of water for the effective running of the Kainji and Jebba hydro-power stations were found in recycling the Jebba tailwater to the headwaters of the Malendo river systems. The result shows that a recycle of 60% of the flow at Lokoja back to Kainji reservoir will g...

Full description

Saved in:
Bibliographic Details
Main Authors: A.W. Alayande, O.A. Bamgboye
Format: Default Conference proceeding
Published: 2003
Subjects:
Online Access:https://hdl.handle.net/2134/30437
Tags: Add Tag
No Tags, Be the first to tag this record!