Scheduling the operations of a double-load crane in slab yards
This paper studies a double-load crane scheduling problem (DLCSP) in steel slab yards. A slab yard stores slabs in stacks. To prepare for use in production, some slabs need to be moved from one place to another. These movement tasks are performed by a double-load crane which can hold up to two slabs...
Saved in:
Main Authors: | , , |
---|---|
Format: | Default Article |
Published: |
2019
|
Subjects: | |
Online Access: | https://hdl.handle.net/2134/37939 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|