An evaluation of productivity factors in Tanzania
This paper is based on research aimed at evaluating construction labour productivity with the view to improving construction industry performance in Tanzania. Comparative analysis of macro-productivity with Kenya, and UK over a 25 year period indicated a downward trend. Analysis of site based produc...
Saved in:
Main Authors: | Ninatubu Mbora Lema, Andrew Price |
---|---|
Format: | Default Conference proceeding |
Published: |
1996
|
Subjects: | |
Online Access: | https://hdl.handle.net/2134/33426 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction labour productivity analysis and benchmarking: the case of Tanzania
by: Ninatubu Mbora Lema
Published: (1996) -
Closure to “Benchmarking: Performance Improvement Toward Competitive Advantage” by N. M. Lema and A. D. F. Price
by: Ninatubu Mbora Lema, et al.
Published: (1996) -
Benchmarking: performance improvement toward competitive advantage
by: Ninatubu Mbora Lema, et al.
Published: (1995) -
An analysis of the Tanzanian construction industry macro-economic performance trends over a 25-year period: 1969-1993
by: Ninatubu Mbora Lema, et al.
Published: (1998) -
Conceptual linkages between benchmarking, total quality management and construction productivity
by: Ninatubu Mbora Lema, et al.
Published: (1994)