AUA guidelines for backfill and contact grouting of tunnels and shafts / edited by Raymond W. Henn, prepared by Technical Committee on Backfilling and Contact Grouting of Tunnels and Shafts of the American Underground Construction Association.
Saved in:
Corporate Author: | |
---|---|
Other Authors: | |
Format: | Book |
Language: | English |
Published: |
London :
Thomas Telford,
2003.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01037nam a22002298 4500 | ||
---|---|---|---|
001 | 001062385 | ||
005 | 20180201150000.0 | ||
008 | 030205s2003 xxk 00000 eng b | ||
020 | |a 0727729837 | ||
020 | |a 0784406340 | ||
082 | 0 | 4 | |a 624.193 |2 21 |
089 | |a 624.19 | ||
089 | |a 624.153 | ||
110 | 2 | |a American Underground Construction Association. |b Technical Committee on Backfilling and Contact Grouting of Tunnels and Shafts. |9 2559 | |
245 | 1 | 0 | |a AUA guidelines for backfill and contact grouting of tunnels and shafts / |c edited by Raymond W. Henn, prepared by Technical Committee on Backfilling and Contact Grouting of Tunnels and Shafts of the American Underground Construction Association. |
260 | |a London : |b Thomas Telford, |c 2003. | ||
300 | |a 200 p. ; |c 24cm. | ||
650 | 0 | 0 | |a Tunneling |
650 | 0 | 0 | |a Grouting |
700 | 1 | |a Henn, Raymond W. |9 2558 | |
952 | |0 0 |1 0 |4 0 |6 624_190000000000000_AME |7 0 |9 663539 |a PILKINGTON |b PILKINGTON |c MAIN |d 2003-05-07 |g 29.05 |l 3 |o 624.19/AME |p 0402741846 |r 2017-09-30 |w 2018-02-01 |y LONG | ||
999 | |c 407493 |d 407493 |