Liquidated damages and extensions of time in construction contracts / Brian Eggleston.

Saved in:
Bibliographic Details
Main Author: Eggleston, Brian
Format: Book
Language:English
Published: Oxford : Blackwell Science, 1997
Edition:2nd ed.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 00770nxm-a2200217zn-4500
001 000761758
005 20180201114910.0
008 970205s1997----en------W----00-----eng--
015 |a b97Z3708 
020 |a 0632042133 
082 0 4 |a 343.4107869  |2 21 
089 |a 343.42078 
100 1 |a Eggleston, Brian 
245 1 0 |a Liquidated damages and extensions of time in construction contracts /  |c Brian Eggleston. 
250 |a 2nd ed. 
260 |a Oxford :  |b Blackwell Science,  |c 1997 
300 |a 337p. 
500 |a Previous ed.: 1992 
650 0 0 |a Construction contracts  |z Great Britain 
952 |0 0  |1 0  |4 0  |6 343_420780000000000_EGG  |7 0  |9 556671  |a PILKINGTON  |b PILKINGTON  |c MAIN  |d 1997-11-19  |e BLAA  |g 39.15  |l 33  |o 343.42078/EGG  |p 0401548147  |r 2017-02-06  |w 2018-02-01  |y LONG 
999 |c 344915  |d 344915