Project cost control in construction / Roy Pilcher.
Saved in:
Main Author: | |
---|---|
Format: | Book |
Language: | English |
Published: |
Oxford :
Blackwell Scientific,
1994
|
Edition: | 2nd ed. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nxm-a2200000zn-4500 | ||
---|---|---|---|
001 | 000335670 | ||
005 | 20211105225430.0 | ||
008 | 940614s1994----en-a----W----00-----eng-- | ||
015 | |a b94Z0148 | ||
020 | |a 0632036370 | ||
082 | 0 | 4 | |a 624.0681 |2 20 |
089 | |a 692.5 | ||
100 | 1 | |a Pilcher, Roy | |
245 | 1 | 0 | |a Project cost control in construction / |c Roy Pilcher. |
250 | |a 2nd ed. | ||
260 | |a Oxford : |b Blackwell Scientific, |c 1994 | ||
300 | |a (400)p : |b 75ill ; |c 23cm | ||
952 | |0 0 |1 0 |4 0 |6 692_500000000000000_PIL |7 0 |9 456925 |a PILKINGTON |b PILKINGTON |c MAIN |d 1994-06-21 |l 21 |o 692.5/PIL |p 0400915405 |r 2008-11-03 00:00:00 |w 2018-02-01 |y LONG | ||
952 | |0 0 |1 0 |4 0 |6 692_500000000000000_PIL |7 0 |9 456926 |a PILKINGTON |b PILKINGTON |c MAIN |d 1995-09-28 |e JMLS |g 35.55 |l 26 |o 692.5/PIL |p 040118238X |r 2017-11-23 00:00:00 |w 2018-02-01 |y LONG | ||
952 | |0 0 |1 0 |4 0 |6 692_500000000000000_PIL |7 0 |9 456927 |a PILKINGTON |b PILKINGTON |c MAIN |d 1995-09-28 |e JMLS |g 35.55 |l 27 |o 692.5/PIL |p 040118241X |r 2019-05-11 00:00:00 |s 2019-05-11 |w 2018-02-01 |y LONG | ||
952 | |0 0 |1 0 |4 0 |6 692_500000000000000_PIL |7 0 |9 456928 |a PILKINGTON |b PILKINGTON |c MAIN |d 1995-09-28 |e JMLS |g 35.55 |l 29 |o 692.5/PIL |p 0401182398 |r 2021-11-13 00:00:00 |s 2021-11-05 |w 2018-02-01 |y LONG | ||
952 | |0 0 |1 0 |4 0 |6 692_500000000000000_PIL |7 0 |9 456929 |a PILKINGTON |b PILKINGTON |c MAIN |d 1995-09-28 |e JMLS |g 35.55 |l 30 |o 692.5/PIL |p 0401182401 |r 2012-06-13 00:00:00 |w 2018-02-01 |y LONG | ||
999 | |c 287869 |d 287869 | ||
942 | 0 | 0 | |0 2 |