Contractor Entitlement to Time Extension under Civil and Administrative Laws and Their Applicability under FIDIC 2017

Forum papers are thought-provoking opinion pieces or essays founded in fact, sometimes containing speculation, on a civil engineering topic of general interest and relevance to the readership of the journal. The views expressed in this Forum article do not necessarily reflect the views of ASCE or th...

Full description

Saved in:
Bibliographic Details
Published in:Journal of legal affairs and dispute resolution in engineering and construction 2024-02, Vol.16 (1)
Main Authors: Elshamy, Ola, Kotb, Akram S., Hamed, Tarek H., Elbheiri, Mohamed
Format: Article
Language:eng
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
recordid cdi_proquest_journals_2884191234
title Contractor Entitlement to Time Extension under Civil and Administrative Laws and Their Applicability under FIDIC 2017
format Article
creator Elshamy, Ola
Kotb, Akram S.
Hamed, Tarek H.
Elbheiri, Mohamed
ispartof Journal of legal affairs and dispute resolution in engineering and construction, 2024-02, Vol.16 (1)
description Forum papers are thought-provoking opinion pieces or essays founded in fact, sometimes containing speculation, on a civil engineering topic of general interest and relevance to the readership of the journal. The views expressed in this Forum article do not necessarily reflect the views of ASCE or the Editorial Board of the journal.
language eng
source ASCE_美国土木工程师学会期刊
identifier ISSN: 1943-4162
fulltext fulltext
issn 1943-4162
1943-4170
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-05-21T09%3A31%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Contractor%20Entitlement%20to%20Time%20Extension%20under%20Civil%20and%20Administrative%20Laws%20and%20Their%20Applicability%20under%20FIDIC%202017&rft.jtitle=Journal%20of%20legal%20affairs%20and%20dispute%20resolution%20in%20engineering%20and%20construction&rft.au=Elshamy,%20Ola&rft.date=2024-02&rft.volume=16&rft.issue=1&rft.issn=1943-4162&rft.eissn=1943-4170&rft_id=info:doi/10.1061/JLADAH.LADR-1060&rft_dat=%3Cproquest_cross%3E2884191234%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c224t-a8f00f4a40e9f987523095dc644bfb84adde5324cf88e5f92ce973b1cb208e923%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2884191234&rft_id=info:pmid/
container_title Journal of legal affairs and dispute resolution in engineering and construction
container_volume 16
container_issue 1
container_start_page
container_end_page
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2884191234</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2884191234</sourcerecordid><originalsourceid>FETCH-LOGICAL-c224t-a8f00f4a40e9f987523095dc644bfb84adde5324cf88e5f92ce973b1cb208e923</originalsourceid><addsrcrecordid>eNo9kN1LwzAUxYMoOKfvPgZ87sxXP_JYus1NCoLM55KmCWa0aU3S6f57Ozd8uffy45x74ADwiNECowQ_v5b5Mt8spvkeTQBdgRnmjEYMp-j6_07ILbjzfo9QEieUzcBY9DY4IUPv4MoGE1rVKRtg6OHOdAqufoKy3vQWjrZRDhbmYFoobAPzpjPW-MkczEHBUnz7P777VMbBfBhaI0VtWhOOF-96u9wWkCCc3oMbLVqvHi57Dj7Wq12xicq3l22Rl5EkhIVIZBohzQRDimuepTGhiMeNTBirdZ0x0TQqpoRJnWUq1pxIxVNaY1kTlClO6Bw8nf8Orv8alQ_Vvh-dnSIrkmUMc0wom1TorJKu994pXQ3OdMIdK4yqU7nVudzqVO4JIPoLt3Ztlw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><isCDI>true</isCDI><recordtype>article</recordtype><pqid>2884191234</pqid></control><display><type>article</type><title>Contractor Entitlement to Time Extension under Civil and Administrative Laws and Their Applicability under FIDIC 2017</title><source>ASCE_美国土木工程师学会期刊</source><creator>Elshamy, Ola ; Kotb, Akram S. ; Hamed, Tarek H. ; Elbheiri, Mohamed</creator><creatorcontrib>Elshamy, Ola ; Kotb, Akram S. ; Hamed, Tarek H. ; Elbheiri, Mohamed</creatorcontrib><description>Forum papers are thought-provoking opinion pieces or essays founded in fact, sometimes containing speculation, on a civil engineering topic of general interest and relevance to the readership of the journal. The views expressed in this Forum article do not necessarily reflect the views of ASCE or the Editorial Board of the journal.</description><identifier>ISSN: 1943-4162</identifier><identifier>EISSN: 1943-4170</identifier><identifier>DOI: 10.1061/JLADAH.LADR-1060</identifier><language>eng</language><publisher>Reston: American Society of Civil Engineers</publisher><ispartof>Journal of legal affairs and dispute resolution in engineering and construction, 2024-02, Vol.16 (1)</ispartof><rights>2023 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c224t-a8f00f4a40e9f987523095dc644bfb84adde5324cf88e5f92ce973b1cb208e923</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>315,787,791,3272,27985,27986</link.rule.ids></links><search><creatorcontrib>Elshamy, Ola</creatorcontrib><creatorcontrib>Kotb, Akram S.</creatorcontrib><creatorcontrib>Hamed, Tarek H.</creatorcontrib><creatorcontrib>Elbheiri, Mohamed</creatorcontrib><title>Contractor Entitlement to Time Extension under Civil and Administrative Laws and Their Applicability under FIDIC 2017</title><title>Journal of legal affairs and dispute resolution in engineering and construction</title><description>Forum papers are thought-provoking opinion pieces or essays founded in fact, sometimes containing speculation, on a civil engineering topic of general interest and relevance to the readership of the journal. The views expressed in this Forum article do not necessarily reflect the views of ASCE or the Editorial Board of the journal.</description><issn>1943-4162</issn><issn>1943-4170</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><recordid>eNo9kN1LwzAUxYMoOKfvPgZ87sxXP_JYus1NCoLM55KmCWa0aU3S6f57Ozd8uffy45x74ADwiNECowQ_v5b5Mt8spvkeTQBdgRnmjEYMp-j6_07ILbjzfo9QEieUzcBY9DY4IUPv4MoGE1rVKRtg6OHOdAqufoKy3vQWjrZRDhbmYFoobAPzpjPW-MkczEHBUnz7P777VMbBfBhaI0VtWhOOF-96u9wWkCCc3oMbLVqvHi57Dj7Wq12xicq3l22Rl5EkhIVIZBohzQRDimuepTGhiMeNTBirdZ0x0TQqpoRJnWUq1pxIxVNaY1kTlClO6Bw8nf8Orv8alQ_Vvh-dnSIrkmUMc0wom1TorJKu994pXQ3OdMIdK4yqU7nVudzqVO4JIPoLt3Ztlw</recordid><startdate>202402</startdate><enddate>202402</enddate><creator>Elshamy, Ola</creator><creator>Kotb, Akram S.</creator><creator>Hamed, Tarek H.</creator><creator>Elbheiri, Mohamed</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope></search><sort><creationdate>202402</creationdate><title>Contractor Entitlement to Time Extension under Civil and Administrative Laws and Their Applicability under FIDIC 2017</title><author>Elshamy, Ola ; Kotb, Akram S. ; Hamed, Tarek H. ; Elbheiri, Mohamed</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c224t-a8f00f4a40e9f987523095dc644bfb84adde5324cf88e5f92ce973b1cb208e923</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Elshamy, Ola</creatorcontrib><creatorcontrib>Kotb, Akram S.</creatorcontrib><creatorcontrib>Hamed, Tarek H.</creatorcontrib><creatorcontrib>Elbheiri, Mohamed</creatorcontrib><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of legal affairs and dispute resolution in engineering and construction</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Elshamy, Ola</au><au>Kotb, Akram S.</au><au>Hamed, Tarek H.</au><au>Elbheiri, Mohamed</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Contractor Entitlement to Time Extension under Civil and Administrative Laws and Their Applicability under FIDIC 2017</atitle><jtitle>Journal of legal affairs and dispute resolution in engineering and construction</jtitle><date>2024-02</date><risdate>2024</risdate><volume>16</volume><issue>1</issue><issn>1943-4162</issn><eissn>1943-4170</eissn><abstract>Forum papers are thought-provoking opinion pieces or essays founded in fact, sometimes containing speculation, on a civil engineering topic of general interest and relevance to the readership of the journal. The views expressed in this Forum article do not necessarily reflect the views of ASCE or the Editorial Board of the journal.</abstract><cop>Reston</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/JLADAH.LADR-1060</doi></addata></record>