Loading…

New power system at Monarch cement

This paper serves as a case study based on what was done at the Monarch Cement plant in Humboldt, Kansas, where a new finish mill was installed and the two preheater kilns upgraded to precalciner kilns with state-of-the-art process technology. This paper is divided into four main sections: History a...

Full description

Saved in:
Bibliographic Details
Main Authors: Green, J.H., Stroker, J.J.
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 344
container_issue
container_start_page 337
container_title
container_volume
creator Green, J.H.
Stroker, J.J.
description This paper serves as a case study based on what was done at the Monarch Cement plant in Humboldt, Kansas, where a new finish mill was installed and the two preheater kilns upgraded to precalciner kilns with state-of-the-art process technology. This paper is divided into four main sections: History and overview of the Monarch Cement Company; Review of the old power distribution system and anticipated demand; Review of the power distribution system changeover; summary and conclusion.
doi_str_mv 10.1109/CITCON.2005.1516375
format conference_proceeding
fullrecord <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_1516375</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>1516375</ieee_id><sourcerecordid>1516375</sourcerecordid><originalsourceid>FETCH-LOGICAL-i175t-bba694253a75dd7df815b159672f2306ff83292ebb3c1af0ec32e969c954289d3</originalsourceid><addsrcrecordid>eNotj8FKAzEURQMqWGu_oJvgfsa8vEkybymD2kJtN3VdkswLjjhtmQyU_r0VCwfO5nDhCjEHVQIoem6W22azLrVSpgQDFp25ETNytbqABMrRrZj8qSBCuBcPOX-rS41VNRFPaz7J4-HEg8znPHIv_Sg_Dns_xC8Zuef9-Cjukv_JPLt6Kj7fXrfNolht3pfNy6rowJmxCMFbqrRB70zbujbVYAIYsk4njcqmVKMmzSFgBJ8UR9RMliKZStfU4lTM_3c7Zt4dh673w3l3vYS_ttg-iw</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>New power system at Monarch cement</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Green, J.H. ; Stroker, J.J.</creator><creatorcontrib>Green, J.H. ; Stroker, J.J.</creatorcontrib><description>This paper serves as a case study based on what was done at the Monarch Cement plant in Humboldt, Kansas, where a new finish mill was installed and the two preheater kilns upgraded to precalciner kilns with state-of-the-art process technology. This paper is divided into four main sections: History and overview of the Monarch Cement Company; Review of the old power distribution system and anticipated demand; Review of the power distribution system changeover; summary and conclusion.</description><identifier>ISSN: 1079-9931</identifier><identifier>ISBN: 9780780391079</identifier><identifier>ISBN: 0780391071</identifier><identifier>DOI: 10.1109/CITCON.2005.1516375</identifier><language>eng</language><publisher>IEEE</publisher><subject>Cement industry ; Companies ; Gears ; History ; Kilns ; Power distribution ; Power engineering and energy ; Power systems ; Principal component analysis ; Transformers</subject><ispartof>Conference Record Cement Industry Technical Conference, 2005, 2005, p.337-344</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/1516375$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>310,311,786,790,795,796,2071,4069,4070,27958,55271</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/1516375$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Green, J.H.</creatorcontrib><creatorcontrib>Stroker, J.J.</creatorcontrib><title>New power system at Monarch cement</title><title>Conference Record Cement Industry Technical Conference, 2005</title><addtitle>CITCON</addtitle><description>This paper serves as a case study based on what was done at the Monarch Cement plant in Humboldt, Kansas, where a new finish mill was installed and the two preheater kilns upgraded to precalciner kilns with state-of-the-art process technology. This paper is divided into four main sections: History and overview of the Monarch Cement Company; Review of the old power distribution system and anticipated demand; Review of the power distribution system changeover; summary and conclusion.</description><subject>Cement industry</subject><subject>Companies</subject><subject>Gears</subject><subject>History</subject><subject>Kilns</subject><subject>Power distribution</subject><subject>Power engineering and energy</subject><subject>Power systems</subject><subject>Principal component analysis</subject><subject>Transformers</subject><issn>1079-9931</issn><isbn>9780780391079</isbn><isbn>0780391071</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2005</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><recordid>eNotj8FKAzEURQMqWGu_oJvgfsa8vEkybymD2kJtN3VdkswLjjhtmQyU_r0VCwfO5nDhCjEHVQIoem6W22azLrVSpgQDFp25ETNytbqABMrRrZj8qSBCuBcPOX-rS41VNRFPaz7J4-HEg8znPHIv_Sg_Dns_xC8Zuef9-Cjukv_JPLt6Kj7fXrfNolht3pfNy6rowJmxCMFbqrRB70zbujbVYAIYsk4njcqmVKMmzSFgBJ8UR9RMliKZStfU4lTM_3c7Zt4dh673w3l3vYS_ttg-iw</recordid><startdate>2005</startdate><enddate>2005</enddate><creator>Green, J.H.</creator><creator>Stroker, J.J.</creator><general>IEEE</general><scope>6IE</scope><scope>6IH</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIO</scope></search><sort><creationdate>2005</creationdate><title>New power system at Monarch cement</title><author>Green, J.H. ; Stroker, J.J.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i175t-bba694253a75dd7df815b159672f2306ff83292ebb3c1af0ec32e969c954289d3</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2005</creationdate><topic>Cement industry</topic><topic>Companies</topic><topic>Gears</topic><topic>History</topic><topic>Kilns</topic><topic>Power distribution</topic><topic>Power engineering and energy</topic><topic>Power systems</topic><topic>Principal component analysis</topic><topic>Transformers</topic><toplevel>online_resources</toplevel><creatorcontrib>Green, J.H.</creatorcontrib><creatorcontrib>Stroker, J.J.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan (POP) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Xplore Digital Library</collection><collection>IEEE Proceedings Order Plans (POP) 1998-present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Green, J.H.</au><au>Stroker, J.J.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>New power system at Monarch cement</atitle><btitle>Conference Record Cement Industry Technical Conference, 2005</btitle><stitle>CITCON</stitle><date>2005</date><risdate>2005</risdate><spage>337</spage><epage>344</epage><pages>337-344</pages><issn>1079-9931</issn><isbn>9780780391079</isbn><isbn>0780391071</isbn><abstract>This paper serves as a case study based on what was done at the Monarch Cement plant in Humboldt, Kansas, where a new finish mill was installed and the two preheater kilns upgraded to precalciner kilns with state-of-the-art process technology. This paper is divided into four main sections: History and overview of the Monarch Cement Company; Review of the old power distribution system and anticipated demand; Review of the power distribution system changeover; summary and conclusion.</abstract><pub>IEEE</pub><doi>10.1109/CITCON.2005.1516375</doi><tpages>8</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier ISSN: 1079-9931
ispartof Conference Record Cement Industry Technical Conference, 2005, 2005, p.337-344
issn 1079-9931
language eng
recordid cdi_ieee_primary_1516375
source IEEE Electronic Library (IEL) Conference Proceedings
subjects Cement industry
Companies
Gears
History
Kilns
Power distribution
Power engineering and energy
Power systems
Principal component analysis
Transformers
title New power system at Monarch cement
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-09-21T23%3A18%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=New%20power%20system%20at%20Monarch%20cement&rft.btitle=Conference%20Record%20Cement%20Industry%20Technical%20Conference,%202005&rft.au=Green,%20J.H.&rft.date=2005&rft.spage=337&rft.epage=344&rft.pages=337-344&rft.issn=1079-9931&rft.isbn=9780780391079&rft.isbn_list=0780391071&rft_id=info:doi/10.1109/CITCON.2005.1516375&rft_dat=%3Cieee_6IE%3E1516375%3C/ieee_6IE%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-i175t-bba694253a75dd7df815b159672f2306ff83292ebb3c1af0ec32e969c954289d3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=1516375&rfr_iscdi=true