Loading…

A New Option for On-Site Drying of Power Transformer: Mobile Vapor Phase Drying

On-site drying power transformer is becoming a habitual process for transformer reparation, refurbishment, reassembly, or maintenance. However, papers reporting existing drying methods in practice admit that those are the alternatives to vapor phase drying (VPD) in workshop. This letter introduces a...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on power delivery 2019-12, Vol.34 (6), p.2254-2256
Main Authors: Qiao, Baozhen, Ma, Zhikai, Qiao, Mu
Format: Article
Language:English
Subjects:
Citations: Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:On-site drying power transformer is becoming a habitual process for transformer reparation, refurbishment, reassembly, or maintenance. However, papers reporting existing drying methods in practice admit that those are the alternatives to vapor phase drying (VPD) in workshop. This letter introduces a new drying method that can fulfill VPD of power transformer at site. This letter also presents the drying performances of the new technology with same results of stationary VPD plant. A case is also shared briefly that 2 units of 1230 MVA/750 kV power transformers were dried both in workshop and in field.
ISSN:0885-8977
1937-4208
DOI:10.1109/TPWRD.2019.2892612